Special Congregational Meeting
October 27, 2002
Call to Order
- Ray Schwinn
Prayer
- Pastor Mark Voll
Introduction Pastor Mark Voll and Gary Schlenvogt
- Church history from 1854 to present.
- Introduction of the Building Committee, Architect and General Contractor.
Process, Rose Morgan
- Started the day after the fire.
- Keep Mission Statement in mind.
- Interviewed four General Contractors.
- Selected members for the Building Committee.
- Kelmann for cleaning and restoration.
- Broad representation of members on the Building Committee.
- Maintain quality of the Sanctuary.
- Maintain traditional look and feel.
- Promote a welcome feeling.
- Options to review.
- Expand size of Chancel.
- Restrictions to rebuilding as was.
- North wall limitations.
- East location of Chancel.
- Plan visits to other Churches.
- Have open house and weekly updates.
Plan and Time Line Gary Schlenvogt
- Choir loft to become seating and Audiovisual control room, with raised seating. This would open space underneath for class and meeting room.
- Storage to be moved from current room to space behind the Alter (East side).
- Removable seating for special events.
- Enlarged Chancel.
- Raised platform.
- Audiovisual screen with improved viewing.
- Two new windows (stained glass) on East side.
- Access to Bell Tower.
- Add door on South wall. o Access to Memorial Hall from the East.
- New door on North wall.
- Pending approval by Congregation work could start 11/04/02 and be finished by the 3rd week in April.
Budget, Ray Schwinn
- Insurance settlement to be $843,672.82.
- Remodeling with East Wall location $112,000.00.
- Organ credit, $66,000.00.
- Other credits, $66,000.00.
- Roughing Air Conditioning to be $14,000.00.
- Total cost of Air Conditioning to be $34,000.00.
- Discussion.
- Nancy Grady, questioned storage under the choir, no office and movable pews.
- Warren Hadler, questioned how many pews and rows of chairs. Number of pews to be determined, 5 rows of chairs with multiple styles to choose from.
- Dan Benson, questioned seating capacity of 214 from 236.
- Debbie Bendt, stated that the money for the Kitchen (as was) is in the settlement. Need to develop total cost of remodeling.
- Sue Voll, questioned placement of door below the window on South wall.
- Geralyn Esselman, door is needed per building code.
- Bill Paape, request a poll of Building Committee members to see if there was a difference of opinion.
- Litha Mueller, original thought was to leave as is.
- Kevin Grady, mixture of membership, tours helped and different ideas presented.
- Ray Schwinn, layout to fit Mission Statement the best, had some cost overrun concerns.
- Cost to rebuild Organ as was is $1 16.000.00, Organ Committee proposed digital organ & piano at a cost of $60,000.00, which would be the best Stewardship of insurance settlement money.
- Fred Gall, stated that the Organ Committee made no vote and that the Organ should be repaired.
- Allow for increased Classrooms for Christian Education.
- Doris Schlenvogt, questioned availability for coats to be hung at East entry.
- Eric Eberhardt, questioned that there was no Cross in presented design. This will be covered in the plan. Also requested that funds be made available for installation of Air Conditioning.
- Motion by Ed Kohn, Second by Tim Sukow, to accept Building Committee's recommendation, vote passed with 2 nays.
- Motion by Karen Wetzel, Second by Tim Sukow, to install Air Conditioning in Sanctuary, vote passed unanimously.
- Motion by Eric Eberhardt, Second by Gary Mueller, to use fire loss money to fund Air Conditioning, vote passed unanimously.
- Alice Rabenhorst stated her personal thank you to the Building Committee for their effort during this process.
- Lisa Krier would like to have better drawings made available for members.
- Questioned if there is any interest in the old Organ.
Adjourn
- Motion by Gary Mueller, Second by Eric Eberhardt to adjourn Congregation meeting, vote passed unanimously.
Closing Prayer
- Pastor Mark Voll
Who We Are | Ministries | Location | Services | Resources
Prayer | Archives | Contact Us | Site Map | Home
Copyright © 1999-2003 Friedens Evangelical Church
454 N. Milwaukee Street, Port Washington, WI 53074
(262) 284-2471